Text Options for the Visually Impaired Font Size: a- A+ Color: A A A Revert 
Close vision bar
Open vision bar

Junior High Construction Update 2/13/19

At Thomas Ewing, permanent electrical power is being set and inside electrical wires are being installed.  In the cafeteria section of the building, water lines, sprinkler system rough ins, windows and external brick are being installed.  HVAC water lines and sprinkler system rough ins are being installed in the gymnasium section.  Water lines are also being installed in the classroom and main entrance sections while window installation is in progress in the main entrance section.  

At General Sherman, the weather conditions have impeded progress over the past week.  In the two story classroom section of the building, structural steel installation was finished and passed inspection.  The underground electric and plumbing lines have been completed in the single story classroom section and have passed inspection as well.

Steve Wigton
Superintendent





Back to School News      Print News Article
Contact Us
Lancaster City School District345 East Mulberry Street
Lancaster, OH 43130