Junior High Construction Update 3/27/19

At Thomas Ewing, the operable windows are being installed throughout the building and metal roof installation continues in various areas.  On the second floor of the two story classroom section, gas lines for the science labs are being installed while electric wire is being pulled and the concrete block walls are receiving the first coat of paint.  Domestic water lines are being installed in the main entrance section, chillers and pumps are being installed in the mechanical room, and sprinkler pipes are being installed in the cafeteria section.  In the single story classroom section, water pipes are being insulated and technology cables are being pulled.  

At General Sherman, the concrete masonry exterior walls and floor drains are complete on the second floor of the two story classroom section of the building ,and one set of stairs have been installed.  The concrete slab floor is being poured in the main entrance section and water pipe hangers are being installed.  Structural steel and decking for the roof are being installed in the single story section while concrete masonry block walls and electrical rough ins are being installed in the gymnasium section.  Temporary electric has now been installed to the building.

Steve Wigton
Superintendent

General Sherman Junior High March 2019

G.S.J.H. Scaffolding around elevator shaft

General Sherman Junior High

GSJH - Bar Joist Area

Thomas Ewing JH

Thomas Ewing Construction Site Progress March 2019

Thomas Ewing Entry Way

Thomas Ewing Entry Way - March 2019

 