General Sherman Construction Update 4/29/2020

General Sherman site plan

Hallway flooring is complete in both classroom sections of the building and other areas are being prepared for flooring.  Student lockers are installed on the second floor of the two story classroom section, the single story classroom section and the locker rooms.  Throughout the building electrical device connections, HVAC wiring, access point wiring, audio/visual equipment installation, glass caulking, bathroom partition installation and plumbing fixture installation continues.