Junior High Construction Update 6/12/19

At Thomas Ewing, cabinetry and ceiling grids are being installed in the second floor of the two story classroom section of the building.  On the site, curbs have been installed for the front parking lot and drives and sidewalk preparation is underway.  Throughout the building, door frames are being prepared for painting, all types of wires are being installed, water lines insulated, sprinkler system lines completed, and electric boxes are being installed.  

At General Sherman in the main entrance section of the building, brick is being installed in the highest portions, drywall is being installed in the administration area, and the media center is being framed for drywall.  Roof drains are being installed in the gymnasium section while underground water pipes and electrical conduit are being installed in the mechanical room area.  In the cafeteria section, roof bar joists, roof decks, and underground electrical conduit are being installed.  HVAC pipes and roof construction are in progress on the second floor of the two story classroom section while HVAC hot water coil units are being installed in the single story classroom section.

Steve Wigton
Superintendent





Back to School News      Print News Article
Contact Us
Lancaster City School District345 East Mulberry Street
Lancaster, OH 43130